Daniel Phelan Elementary
SCHOOL ACCOUNTABILITY REPORT CARD
Data From the 2008-2009 School Year | Published During 2009-2010

Grades 9-12
7150 South Cully Ave.
Whittier, CA 90606
P 562 789-3210
F 562 789-3215

   
 

Facilities Maintenance

Information for Whittier City Elementary
Facilities Deferred Maintenance Budget - District (if applicable)
The district participates in the State School Deferred Maintenance Program, which provides state matching funds on a dollar-for-dollar basis, to assist school districts with expenditures for major repair or replacement of existing school building components. Typically, this includes roofing, plumbing, heating, air conditioning, electrical systems, interior or exterior painting, and floor systems. For the 2008-09 school year however, the district utilized the flexibility option authorized by the state and did not budget funds for the deferred maintenance program. At this time the district is anticipating receiving the state contribution to the Deferred Maintenance Program for 2008-2009 in excess of $250,000.
 
Copyright © 2012 School Innovation & Advocacy. All Rights Reserved.